Renewable Energy Projects

This is your Project Page. It's a great opportunity to help visitors understand the context and background of your latest work. Double click on the text box to start editing your content and make sure to add all the relevant details you want to share.

Major Renewable Energy Projects

HLG01734 (1).jpg

Aqaba WWTP PV & CHP System (1800 kwP PV, 900 kwP CHP)

Our team played a pivotal role in the Aqaba WWTP PV & CHP System project, installing a comprehensive system that included 1800 kWp of PV and 900 kWp of CHP, designed as a zero-export system. This project underscores our capability in implementing complex energy solutions that align with modern sustainability standards.

Tafila Wind Farm (117,000 kWp)

Our team was integral to the Tafila Wind Farm project, an EPC initiative delivering 117 MW of renewable power, where we provided both civil and electrical works. Collaborating with JWPC and VESTAS as the client and consultant by CUBE Engineering, we showcased our ability to handle large-scale renewable energy projects, emphasizing our commitment to sustainable development and clean energy solutions.

800px-Vestas_Wind_Systems_entrance_in_Pueblo_County,_Colorado.JPG
IMG_20220302_134950.jpg

Modern Cement Factory PV System (1500 kWp)

We successfully implemented a 1500 kWp photovoltaic (PV) system for a Modern Cement Factory, integrating it with an existing power plant. This project demonstrates our capability in designing and executing complex renewable energy solutions that enhance industrial energy efficiency and reduce environmental impact.

Steel Factory Hangar PV (900kWp)

We completed the installation of a 900 kWp net metering project for a hangar. This initiative effectively integrated solar energy into their existing power infrastructure, optimizing energy usage and reducing operational costs through net metering.

DJI_0588.JPG
bayader station.jpg

PV system for Manaseer Gas Stations (16 Gas Stations) (1000 kwP) (Net Metering)

ATCCO successfully executed photovoltaic (PV) system installations across 16 Manaseer gas stations under the net metering scheme, with a total capacity of 1000 kWp. These projects integrated renewable energy solutions into existing facilities, reducing operational costs and carbon footprint while showcasing ATCCO’s capability in sustainable infrastructure development.

Check The Rest

Download our brochure to access the full catalogue of ATCCO’s completed projects not listed on our web page